Build Over Agreement Costs

If permission is granted, your home must meet the conditions set by the Water Authority to ensure the protection of the affected sewers. Not only if you don`t get permission during your final post-construction assessment, you`ll have to pay for any modifications or repairs requested by the water company. You may even be asked to buy new pipes for your affected sewers, or you may need to build a new canal cover so they can easily access the area in the future. This is the reason why it is always worth highlighting a certain budget in this unexpected cost. With the risk of ignoring or neglecting a Thames Water Build over agreement, which is a non-construction injunction or settlement, and with the cost of receiving the agreement from £299 to £1,300. We thought it would be useful to take a closer look at this topic, to ensure that it is not overlooked in your proposed design. You must create a Build-Over/Near application through our InFlow online portal if you do not meet our standard criteria. We saw a case where the owner assumed that the contractor had taken care of the Thames Water-Build-Over agreement, while the contractor thought the owner had done so. This confusion resulted in a 4-week delay in the work, while the corresponding location studies were carried out, plans were drawn up and thames water engineers were visited on site. As Thames Water is legally responsible for the maintenance of these sewers and effluents, there are construction agreements to ensure that these elements have been taken into account when designing your proposed foundations. A Build Over agreement gives the water company the assurance that the work to be done will not negatively impact the underlying sewers and also ensures that the water company retains sufficient access to the sewers so that it can be repaired and maintained.

If you plan to build near or above a public sewer, you should contact the water company before the work done to identify the needs. To apply for construction above or near a public sewer, please apply via InFlow via the link on the right. How are you going to do it? Here`s our complete guide to your home, sewers, sewers, and construction agreements. Sometimes problems arise when homeowners try to sell their property, partially or entirely built over a public sewer. Winter gardens and extensions are the usual culprits. If no construction contract has been concluded during the execution of the work, the water company has the legal right to enter the land to access the sewers, even if this means that the structure above the sewers will be demolished. However, the Water Company will not cause damage to the extent possible and will look for other ways to access the sewers, but the risk remains. If a Build Over agreement has been reached, the water company is not allowed to remove or demolish the structure above the sewers. The first takeaway is that a build-over agreement only applies to public sewers and sewers. The agreement not only ensures that Thames Water will in future be able to have sufficient access to sewers or sewers, but it also ensures that the proposed foundations are designed in such a way as to reduce the risk to the canal or flow. .

. .